New
Flood Mitigation 4.0
Drying, extraction and monitoring in one unit.
£840 per week, ex VAT - delivery included
Fully kitted workshop units on site in 48 hours.
Keeping resources on site
Every unit is specified, tested and inventoried before it ships.
Free delivery and pick up on all hires.
New
Drying, extraction and monitoring in one unit.
£840 per week, ex VAT - delivery included
New
Soot containment, filtration and clean down.
£890 per week, ex VAT - delivery included
Wash-down, waste and PPE for general sites
£600 per week, ex VAT - delivery included
We keep the workshop where the building is - so the work never leaves site.
Drying, extraction and monitoring in one unit, on site in 48 hours.
View the unit
PAT-tested equipment, inventoried and loaded at our depot - no depot trips for your team.
See what's included
Why on site wins
Moving joinery, art or masonry off a listed building means transport, handling risk and insurance. A GorillaGear unit puts the workshop in the compound instead — the same bench, the same tools, no journey.
1Prices shown are weekly hire rates excluding VAT and assume a minimum two-week hire. Delivery, siting and collection are included on all hires within mainland UK. 2Lead time of 48 hours applies to units held in stock and requires level ground, 4.5 m overhead clearance and vehicle access within 6 m of the drop point.